5 Mistakes to Avoid With General Contractor
The most expensive general contractor mistake Boulder City homeowners make isn’t choosing the wrong tile or the wrong paint color. It’s signing a contract with no payment schedule tied to completion milestones, which hands the contractor all the leverage on day one. Once that signature dries, a homeowner with money still owed is in control; a homeowner who’s already paid most of the job is not. Here are the five contractual and procedural errors that cost the most money, all of them made before a single tool comes out.
Key Takeaways
- Sign a milestone-based payment schedule, not a big deposit followed by a lump sum.
- Verify the permit is pulled for your address, not a subcontractor’s LLC.
- Put every change order in writing and signed – a verbal “we’ll just add that” can void your guarantee.
- Do a punch-list walkthrough before you release the final draw.
- Confirm every subcontractor is licensed in Nevada before they touch your house.
If reading all this makes you wish someone would just hand you a contract where those five things are already handled, that’s a fair reaction. Call (844) 797-9259 and we’ll walk you through how a written price and a signed guarantee look before work starts.
Mistake 1: Signing a Lump-Sum Contract With No Milestone-Based Draw Schedule

A lump-sum contract that asks for 30% to 50% down and the rest on completion puts you at real risk on any Boulder City remodel. The mechanic’s lien law in Nevada works in the contractor’s or supplier’s favor: an unpaid subcontractor or material supplier can file a lien against your property even when you’ve already paid the general contractor in full. That’s the trap. You don’t just lose the money you thought you paid for work – you can end up owing again to someone the contractor stiffed.
What protects you is a draw schedule tied to completion. A reasonable structure for a typical kitchen project looks like this:
- Mobilization deposit: 10-15%, once the contract is signed and the schedule is set.
- Rough-in complete: 20-25%, when framing, plumbing, and electrical rough-in pass inspection.
- Cabinetry and surfaces installed: 30-35%, when KraftMaid or Wellborn cabinets are set and Cambria surfaces are in place.
- Final punch list and close: 30-35%, released only after walkthrough and final inspection.
The point isn’t the exact percentages – it’s that no single draw is large enough to leave you exposed. Get the schedule in writing, tie each draw to a verifiable milestone, and ask for a lien waiver at each stage. That single document is the cheapest insurance on a Boulder City job.
Mistake 2: Letting the Contractor Pull Permits Without Verifying the Address
A permit is only as good as the name and address on it. When a Boulder City contractor says “don’t worry, I’ll pull the permits,” the next thing you should do is ask to see the permit itself – and match the property address and the legal contractor name to what’s on your contract. We’ve seen jobs where a permit was pulled under a subcontractor’s LLC against a different address entirely, which means the inspections that are supposed to protect you were never tied to your house.
Clark County and Boulder City both require permits for structural, electrical, plumbing, and mechanical work. That permit record becomes the paper trail you need at resale, for insurance, and if anything goes wrong later. Ask these three questions before work begins:
- What is the permit number, and can I see the approved copy?
- Whose name is the permit issued to?
- Will the final inspection be scheduled before you ask me for the last draw?
Any contractor who won’t produce those on request is telling you something. Every project we take on here is bid and permitted under the homeowner’s address, with the paper in your hand.
Mistake 3: Accepting a Verbal Change Order Instead of a Signed Written Amendment

The single most common way to void a contractor’s workmanship guarantee is a verbal change order. In our experience, homeowners agree to “just move the island six inches” or “swap that GAF shingle for something else” with a handshake and a phone call, and then three months later the written guarantee doesn’t cover the change – because the change was never in writing. Some contractors do this deliberately. Most do it casually. Either way, you’re the one holding the loss.
A signed written amendment should include:
- The exact scope change (measurements, materials, brands, model numbers).
- The additional or reduced dollar amount, in writing.
- The impact on the schedule, if any.
- Confirmation that the guarantee still covers the modified work.
If your contractor calls a change order a “handshake deal” or “we’ll square up at the end,” you don’t have a change order – you have a future dispute. Get it in writing. No exceptions. Our written scope language and pricing are documented before work begins, and every change stays on the same paper trail.
Mistake 4: Skipping the Punch-List Walkthrough Before the Final Draw
The final draw is your last piece of leverage. Once you release it, you’ve paid in full and the contractor’s incentive to return for callbacks drops off a cliff. That’s why the punch-list walkthrough is non-negotiable – and it needs to happen before you sign the final payment authorization, not after.
A proper punch list is a written document, not a verbal “we’ll come back next week.” Walk the site with the contractor, room by room, and list every deficiency:
- Paint touch-ups and caulk lines at trim, casing, and soffit.
- Cabinet alignment, door swing, and drawer glide on KraftMaid or Wellborn boxes.
- Tile grout joints, transitions, and edge profiles.
- Fixture function – every Kohler or Moen faucet, every outlet, every switch.
- Site cleanup, dumpster removal, and haul-away of protective floor coverings.
Both parties sign, one copy goes to you. Only then does the final draw get released. Squared away means a clean site, a documented scope, and a signed guarantee in your hand – not a promise over the phone.
Mistake 5: Not Confirming Subcontractor License Status in Nevada

On a typical Boulder City remodel, the general contractor is only half the story. Electricians, plumbers, drywall crews, and cabinet installers are often subcontractors – and in Nevada, an unlicensed subcontractor on your property creates direct liability for you, the homeowner. That’s not a paperwork nuisance. It’s a real risk to your insurance and to any future claim.
The Nevada State Contractors Board maintains a public license lookup. Before work begins, ask the general contractor for a written list of every subcontractor and their license number, and verify each one. Any contractor who balks at this is doing you a favor by revealing themselves early. In our experience, the trades worth hiring don’t mind being checked.
This is also where you find out what kind of company you’re dealing with – background-checked, uniformed technicians who show up when scheduled, or whoever’s free that morning.
When to Call a Pro
Some of these mistakes you can manage on your own. Most, once work is underway and money has changed hands, are effectively impossible to unwind without a lawyer. If you’re not comfortable reading a draw schedule, checking a permit record, or verifying a subcontractor’s license, don’t sign the contract yet. A short conversation with a contractor who runs on disciplined process will save you real money.
Since a general contractor touches most of the house, most of these mistakes show up in the highest-dollar rooms first – the kitchen and the bath. If you want a straight read on how a proper contract handles all five, that’s the conversation to have.
Related services in Boulder City: General Contractor in Boulder City, Kitchen Remodeling in Boulder City, and Bathroom Remodeling in Boulder City. Start with the Bradford Remodeling Boulder City home page for the whole picture.
The Bottom Line
Every one of these five mistakes is a contract problem, not a construction problem – which means they’re avoidable if you look at the paperwork before you look at the tile samples. Get a milestone-based draw schedule. Verify permits and subcontractor licenses. Insist on written change orders. Do the punch-list walkthrough before the final release. Do those five things and the surprises go away.
If you’re in Boulder City and need help, Bradford Remodeling Boulder City offers free estimates – call (844) 797-9259. Every project comes with a written price before work begins and is covered by our 365-Day Done Right Promise: if the work fails within the full year, we come back and make it right at no charge. That’s The Garrison Standard in practice, and it’s why homeowners who’ve been burned elsewhere call us to get it in writing.
Frequently Asked Questions
Signing a contract without a milestone-based payment schedule. It gives the contractor all the leverage on day one and exposes you to mechanic’s lien risk if subcontractors go unpaid. Insist on a written draw schedule tied to verifiable completion milestones before you sign anything.
Yes, always. In Nevada, an unlicensed subcontractor on your property creates direct liability for you, and a permit pulled under the wrong address or entity means the inspections meant to protect you never applied to your house. Ask for license numbers and permit copies before work starts, and verify through the Nevada State Contractors Board lookup. Call (844) 797-9259 if you want a second set of eyes on what you’ve been handed.
Yes. Any verbal change to the scope – a moved island, a swapped material – usually falls outside the written guarantee because it was never documented. Get every change as a signed amendment with the scope, price, schedule impact, and a confirmation that the guarantee still covers the modified work.
A typical kitchen runs six to ten weeks; a whole-home remodel usually three to six months, depending on permit timelines and scope. Any contractor who quotes a schedule without a written draw and milestone plan isn’t giving you a schedule – just a number. Call (844) 797-9259 for a written estimate with a real timeline.
Written by the team at Bradford Remodeling Boulder City.