







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Sterling Home Additions & ADU: The Boulder City Owner’s Guide
We build and install home additions and ADUs to Sterling-compatible specifications for Boulder City homeowners, and a finished addition typically runs $45,000 – $130,000 depending on size, foundation, and utility work; an ADU runs $90,000 – $220,000. A garage conversion sits in the middle at $30,000 – $80,000. These are planned builds, so the timeline is measured in weeks, not hours – we give you a written price before any work starts.
Owners usually come to this page after a different discovery: a Sterling spec sheet or plan set that doesn’t match their lot, a failing connection at the existing wall, or an HOA and city review that flagged something the first contractor skipped. Boulder City has its own review path, and the details matter. More often than not, the “failed part” is a detail – a footing, a tie-in, a rough-in – that was undersized or undocumented.
Key Takeaways
- Addition: $45,000 – $130,000. ADU: $90,000 – $220,000. Garage conversion: $30,000 – $80,000.
- Every project comes with a written price before work begins and the 365-Day Done Right Promise after.
- Boulder City’s desert climate and historic-district review shape what you can build and how.
- Bradford Remodeling Boulder City is an independent contractor, not affiliated with Sterling.
Which Sterling Models This Applies To

Sterling has offered modular and panelized addition and ADU packages across several plan families, and the framing, foundation, and utility connections differ by series. Before we quote a Boulder City job, we identify the exact plan set – by model number, sheet index, and the panel labels stamped on each wall section and floor cassette. That label is the compatibility gotcha: two Sterling plans that look identical on the marketing sheet can call for different foundation depths and different rough-in locations, and building to the wrong sheet is where budget goes sideways.
On the OEM-versus-aftermarket call: for structural members, connectors, and the panelized shell, we match Sterling’s specified gauges and hardware, because substituting an undersized connector is the kind of shortcut the 365-Day Done Right Promise exists to prevent. For finishes – cabinetry, surfaces, fixtures – you have room. We work with a documented roster that includes KraftMaid and Wellborn cabinetry, Cambria and Silestone surfaces, and Kohler and Moen fixtures, so specifications stay traceable from the plan to the installed part.
Bring us your Sterling plan set, model number, or the labels off an existing structure, and we’ll confirm fit in writing before anything is ordered.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Sterling Addition or ADU Is Failing
- Hairline cracks along the wall-to-foundation joint. Usually a footing that was poured shallow for Boulder City’s caliche-heavy soil, or a tie-in that wasn’t anchored per the plan sheet. Left alone, it widens with each seasonal swing.
- Doors and windows that stick in summer, then free up in winter. This points to thermal movement in the shell – a panel or header that wasn’t fastened to the Sterling spec. It reads as a finish problem but usually traces back to framing.
- Water staining at the roofline or where the addition meets the original house. Often a flashing and kickout detail that was skipped. In our monsoon-season rain, that small gap becomes an interior leak within one season.
- Soft spots or dips in the floor. A floor cassette or joist that was undersized or under-supported. It gets worse under furniture load and is expensive to correct late.
- Utility rough-ins that don’t line up with the fixtures. A drain or supply set at the wrong location for the plan, which forces a rework of the wall or a change to your fixture layout.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Installed ranges for Boulder City, all quoted in writing before work starts:
- Home addition: $45,000 – $130,000
- ADU construction: $90,000 – $220,000
- Garage conversion: $30,000 – $80,000
What moves the number: footprint and foundation depth, whether sewer or septic work is needed, electrical panel capacity, and finishes. A slab-on-grade build on flat ground sits low in the range; a site that needs engineered footings, a panel upgrade, or extensive utility trenching moves toward the top. We separate parts and labor line items so you can see what the shell costs versus the finishes. Every completed project carries the 365-Day Done Right Promise – if the work fails inside that window, we come back and correct it at no charge, with the terms in writing.
DIY or Call Us?
There’s an honest split here. You can safely check the visible stuff: note crack widths at the foundation joint, photograph water stains, test doors and windows through the seasons, and record the model and panel labels off your Sterling plan set. That information helps us quote accurately.
What you shouldn’t do yourself is anything structural or utility-related. Foundation correction, framing, roof tie-ins, electrical rough-in, and gas or plumbing connections carry real risk – a missed detail there is a safety and code problem, not a weekend fix. That’s the work for a licensed crew, and it’s where a written scope and permit trail protect you. Call (844) 797-9259 and we’ll walk your plan set and the failing detail with you.
FAQs

How long does a Sterling-compatible addition or ADU last? A properly built addition or ADU is a decades-long structure. In Boulder City’s climate, the failure points are the tie-ins and roof flashing, not the frame itself – which is why those details get the most attention in the plan review.
Can it be repaired instead of rebuilt? Sometimes. A flashing issue or a single undersized connector can often be corrected without touching the whole structure. Foundation or framing failures usually can’t. We inspect first and give you a written recommendation before pricing either path. Call (844) 797-9259 for a free estimate.
How long does the build take? A garage conversion runs on the shorter end; a full ADU runs longest because of foundation, utility, and inspection stages. Boulder City review timelines factor in. We give you a written schedule with the price.
How do you source the parts? We match the Sterling plan set for structural members and connectors, and source finishes from a documented brand roster. Nothing is ordered until the spec is confirmed in writing and priced.
Bradford Remodeling Boulder City is an independent contractor and is not affiliated with Sterling. We’re part of the Garrison Partners family, operating under The Garrison Standard, with background-checked, uniformed technicians, live-person phone coverage 24/7, and up to 22 years of technician experience. Call (844) 797-9259 for a free estimate.
Written by the team at Bradford Remodeling Boulder City, serving Boulder City and nearby areas.












