







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ActiveYards Home Additions & ADU: The Boulder City Owner’s Guide
We build and finish ActiveYards-compatible home additions and ADUs in Boulder City, and installed projects here typically run $45,000 to $130,000 for an addition and $90,000 to $220,000 for a detached or attached ADU. The component that usually fails first isn’t the structure – it’s the connection between the addition and the original house: a roof tie-in that opens, a door or window unit that stops sealing, or a piece of trim and flashing that lets in water. Owners find out during the first hard rain or when a bedroom or office corner starts to feel warmer than the rest of the house.
Boulder City weather is unforgiving on those seams. Summer highs push past 105°F, winter nights drop into the 30s, and the daily swing alone moves metal and wood in ways that quietly work fasteners loose. If your addition or ADU was built with ActiveYards components and something in that connection has failed, this page is written for exactly that call.
Key Takeaways
- Installed additions in Boulder City: $45,000 – $130,000. ADUs: $90,000 – $220,000.
- The failure point is almost always the tie-in: flashing, sealant, fasteners, or a door/window unit.
- We’re an independent contractor, not affiliated with ActiveYards. We build to their component specs.
- Written price before any work starts. 365-Day Done Right Promise on every project.
Which ActiveYards Models This Applies To

ActiveYards makes outdoor structures – pergolas, pavilions, and shade systems – built from aluminum and composite framing. When a homeowner asks us to bring one of those structures into a finished addition or ADU envelope, the part that matters is how the framing, posts, and roof panels connect to the house and to the foundation. That’s where the specific model matters.
Before we quote anything, we read the label on the structure itself. ActiveYards stamps or tags its posts and beams with the series name and the post size – most residential units run 4×4, 6×6, or 8×8-inch posts, and the size determines what footing and attachment hardware we specify. If the label is gone, we measure the post face and the beam span directly and match it against the manufacturer’s specs.
On the OEM-versus-aftermarket decision: for structural connectors, footings, and roof tie-in hardware, we specify OEM or an engineer-approved equivalent, because the load ratings and corrosion treatment need to match. For cosmetics – trim, fasteners, finish pieces – a quality equivalent is often the honest call and saves the homeowner real money. We’ll tell you which is which in writing. We also install and service KraftMaid, Cambria, and Silestone components inside finished ADUs, so the interior finish scope comes from the same documented catalog.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your ActiveYards Home Additions & ADU Is Failing
These are the symptoms we see most often on Boulder City additions, and what’s usually behind each one.
- Water staining at the wall connection. Flashing that was sealed instead of stepped lets water behind the siding. Once it’s in, it travels, and you’ll see the stain a foot or two from where the leak started.
- Doors and windows that stick or drag. A door unit or frame has shifted, usually because the header or the footing moved. In Boulder City’s soil, that can happen within the first few thermal cycles.
- Visible gaps at the roofline or beam pockets. Fasteners have backed out or the sealant has failed. Metal expands and contracts more than wood, so this shows up on aluminum-framed connections first.
- Interior that won’t hold temperature. Insulation has settled or a seal has opened and the envelope is leaking air. An addition that runs 8 to 10 degrees off the main house is telling you where.
- Soft or lifted spots on the floor near the perimeter. The substrate gets wet from a failed threshold or footing detail. Fix it early and it’s a repair; wait and it’s a floor replacement.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what this work actually costs in Boulder City, with line items rather than a single mystery number.
| Scope | Installed Range (Boulder City) |
|---|---|
| Home Addition (full scope) | $45,000 – $130,000 |
| ADU Construction (attached or detached) | $90,000 – $220,000 |
| Garage Conversion to living space | $30,000 – $80,000 |
| Door unit replacement (single, impact-rated) | $800 – $2,500 |
| Window replacement (per opening) | $450 – $1,400 |
| Roof tie-in and flashing repair | $600 – $3,200 |
The range is driven by three things: size of the footprint, the condition of what we’re tying into, and finish level. A repair to one failed connection sits at the low end. A full addition with a new slab, framing, envelope, and finished interior sits at the top. We give you the price in writing before work begins, and it doesn’t move at the door. Every installed project carries the 365-Day Done Right Promise – if the work fails within that full year, we come back and correct it at no charge.
DIY or Call Us?
There’s a safe, useful list of things you can check yourself: look for staining at the wall connection, feel for temperature differences room to room, check that doors and windows open cleanly, and photograph any gap or lifted sealant. That information helps us quote accurately.
What we don’t recommend is re-flashing a roof tie-in, resetting a footing, or trying to correct a header yourself. Those affect the structural load path and the waterproofing envelope, and a mistake there won’t show up until the next rain or the next hot week – by which point the damage is behind the wall and inside the structure. On additions and ADUs, the tie-in is where a professional’s judgment matters most. Our technicians have up to 22 years of experience on exactly this kind of work, and our crew is background-checked and uniformed, so you know who’s arriving.
Call (844) 797-9259 to schedule your free estimate.
FAQs

A properly built addition should hold 30 years or more, but the sealing and tie-in details need attention every 7 to 10 years in this climate. Boulder City’s UV load and temperature swing are harder on sealant and finish than most of the country. If you’re past that window and haven’t had the connection checked, it’s worth a look.
Usually yes, if the structure around it is sound. A failed sealant joint or a backed-out fastener is a repair. A footing that has moved or a header that has deflected is a replacement – and we’ll tell you which one you’re looking at, in writing, before any work begins. Call (844) 797-9259 for an exact quote; estimates are free.
A flashing and sealant repair is typically a one-day job. A door or window unit replacement is one to two days. A structural correction depends on scope, and we give you the timeline with the written price. We don’t quote a date we can’t hold.
We match the part to your ActiveYards model by measuring the actual post and beam sizes and cross-referencing the manufacturer’s specs, then specify OEM or an engineer-approved equivalent for anything structural. One note: we don’t stock parts and we don’t carry parts on a truck – part numbers can change between series, so a mismatched connector is a real risk. We confirm the spec first, then order. We’re an independent contractor and not affiliated with ActiveYards; we build to their component specifications and stand behind our own work with the 365-Day Done Right Promise.
Ready to price it? Call Bradford Remodeling Boulder City at (844) 797-9259 for your free estimate. A live person answers, and you’ll have a written price in hand.
Written by the team at Bradford Remodeling Boulder City, serving Boulder City and nearby areas.












