A Bradford company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows

ADU Cost in Boulder City - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
An open living space after a whole-home remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A remodeled living room with built-in shelves around the fireplace
An open kitchen and dining area after a remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What an ADU Costs in Boulder City, NV - and Why Your $90,000-$220,000 Number Has to Start With a Site Check

An ADU in Boulder City typically runs $90,000-$220,000 for construction, and most homeowners here should budget in the $45,000-$130,000 range for a smaller garage conversion or attached unit. But here’s the part national cost guides won’t tell you: not every Boulder City lot supports an ADU at all. Historic district overlays, minimum lot-size rules, and the city’s own charter mean your buildable configuration controls the price far more than square footage does. Call (844) 797-9259 for a free feasibility check before you price a single plan.

A wide opening with a new beam where the kitchen wall was removed

Nevada’s 2019 ADU legislation preempted a lot of local restrictions across the state. Las Vegas and Reno homeowners got a fairly clear path. Boulder City is different, and anyone quoting you a flat price-per-square-foot number is skipping the part where your lot either qualifies or doesn’t.

The city was built in the 1930s as a federal company town for Hoover Dam workers, and much of that historic core is still intact. Stucco, adobe, and masonry homes from the 1930s-1950s sit under design review that can govern an ADU’s exterior form, roof pitch, and materials on the visible side. So the first question isn’t “how much per foot.” It’s “does this lot allow an ADU, and does design review shape it?”

Three things decide that in Boulder City:

  • Lot size and existing coverage. Your existing home, garage, and impervious surfaces count against what’s left. A lot that looks roomy can be nearly maxed out.
  • Historic district vs. non-historic. Inside the overlay, design review adds a submission fee and a review timeline before a single permit moves. Outside it, the path is faster.
  • Permit jurisdiction. Confirm before you build whether your project falls under the City of Boulder City or Clark County review, since the two have different submission requirements and timelines.

That’s the feasibility check. It’s the first thing we do, and it’s where the honest number starts.

Where the Money Actually Goes: The Boulder City ADU Cost Stack

Most online ADU guides hand you a price per square foot and wave at “permits.” Here’s the real breakdown, line by line, in the ranges we quote in Boulder City:

Cost item Typical range in Boulder City
Design and drafting (historic-compliant) $4,000-$12,000
Design review submission and timeline $1,500-$5,000
City or county permit review $2,000-$6,000
Site work, grading, and desert drainage $8,000-$25,000
Foundation in caliche soil $10,000-$30,000
Utility connection (may cross BLM-adjacent easements) $5,000-$18,000
Structure, finishes, and systems $65,000-$140,000
Full ADU construction total $90,000-$220,000
Garage conversion (where feasible) $30,000-$80,000

The item that surprises people most is the ground underneath the ADU. Boulder City sits as a low-density island surrounded by federal land (Lake Mead NRA and BLM), which means most new units land on infill lots. Caliche, the hard calcium-cemented soil layer common in the desert Southwest, doesn’t dig easily and sometimes has to be broken or over-excavated before a foundation goes in. That’s a real cost, and it varies lot to lot.

Flash-flood risk in the surrounding canyons adds another line: proper grading and drainage so runoff routes around the structure rather than through it. And summer highs regularly above 100°F complicate concrete curing and push outdoor work into early mornings. None of that shows up in a national calculator.

Footing forms with tied rebar for a home addition

Why Documented Materials Make Design Review Move Faster

Historic design review asks a simple question: what exactly is going on the exterior, and does it fit? A vague “hardie siding and a nice door” answer invites requests for more information, which stretches the timeline and adds redesign cost.

We specify from a documented roster of name-brand materials with published specs, which means the board sees exact products, finishes, and profiles up front:

  • James Hardie siding with known profile and color options for the visible elevations.
  • Therma-Tru doors with manufacturer finish specifications.
  • Kohler and Moen fixtures for the interior drawings that accompany the submission.
  • Roofing from documented lines like Owens Corning when shingle type factors into the review.

Manufacturer specs and warranties also back Bradford’s own guarantee. When we hand you a written price, the materials behind it are traceable, not left to guesswork. This is part of what we call The Garrison Standard, and it’s why specifications don’t drift after review.

What the First Check Covers vs. What Construction Covers

Homeowners sometimes expect the first payment to break ground. It doesn’t, and that’s on purpose.

The feasibility and written-price stage: we confirm which jurisdiction reviews your project, measure lot coverage and setbacks, note historic overlay conditions, and give you a written price for design and permitting before any work starts. You see the number before tools come out.

The construction stage: the written price from stage one becomes the baseline for the build. Every completed project carries our 365-Day Done Right Promise. If something we built fails inside that year, we come back and correct it at no charge. That’s written into the agreement, not spoken.

Live people answer the phone around the clock, and the technicians we send are background-checked and uniformed. You know who’s showing up.

Common Local Scenarios We See in Boulder City

A 1940s stucco home near the historic core. The main house is fine, the lot has room, but the ADU’s visible elevations will get design review. Plan for the submission fee and a longer approval timeline, and lean on documented materials to keep redesign risk low.

A larger infill lot edged by federal land. Grading and drainage carry a premium because runoff has to be managed carefully. Caliche often shows up during excavation, adding foundation cost.

A garage conversion on a tight lot. Usually the least expensive path at $30,000-$80,000, but only where the existing structure and coverage rules allow it. A feasibility check tells you fast.

FAQs

Ready to Get a Real ADU Number for Your Lot?

Skip the online calculator that assumes a lot nothing like yours. We’ll check your lot size, coverage, historic overlay status, and soil conditions, then give you a written price before any work starts, backed by the 365-Day Done Right Promise. Call (844) 797-9259 today for a free estimate on your Boulder City ADU.

Written by the team at Bradford Remodeling Boulder City, serving Boulder City, NV.

What Our Customers Say

★★★★★ 5.0 from 3+ reviews

"Fixed price, written scope, and no surprise charges."

- Wes D.

"Respectful crew. Covered the floors and swept every day."

- Jackie T.

"Home remodel with a new floor plan. Handled structural work and permits without drama."

- Gus R.

Ideas for every room in the house

Built-ins, window seats, family rooms and staircases: the changes that make a whole house work better.

Read our remodeling guides
A freestanding soaking tub in a remodeled primary bathroomA whole-home remodel with the living, dining and kitchen areas opened upA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA remodeled family room with new windows and a window seatA stone counter, tile backsplash and open shelf after a kitchen remodel

Explore more remodels

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Bradford in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Boulder City? Licensed & insured · free written estimates
Call (844) 797-9259

Request a Free Estimate

Tell us what's going on in Boulder City. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch