







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU: The Boulder City Owner’s Guide
If you own a KraftMaid-equipped home and you’re pricing an addition or accessory dwelling unit in Boulder City, plan on $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a full ADU, with KraftMaid cabinetry matched to your existing door style and finish. We handle design, permitting, build, and finish as an independent remodeling contractor. Bradford Remodeling Boulder City is not affiliated with KraftMaid, but we install their cabinet lines regularly and know what it takes to make new construction read as the same house. Owners usually reach this page after a different discovery: a failing cabinet hinge, a door that won’t sit flush, a swollen box near a slab, or a finish that has gone chalky in the desert sun. That’s the moment the addition conversation starts, and it’s usually the right one.
Key Takeaways
- Home additions in Boulder City run $45,000 – $130,000; ADUs run $90,000 – $220,000.
- KraftMaid cabinet matching depends on your door style and finish program, not just the color name.
- Written price before any work starts, every time.
- Every completed project carries the 365-Day Done Right Promise.
Which KraftMaid Models This Applies To

KraftMaid builds cabinet lines across several door-style families and two main construction tiers, and the tier matters more than most homeowners expect when you’re adding a kitchenette, a wet bar, or a laundry wall onto an existing house. Their all-plywood construction lines hold up better in a Boulder City addition that faces west and bakes from May through September. Their standard framed lines are fine for interior walls that stay shaded. If you’re matching cabinets to an existing KraftMaid kitchen, the door style name is printed on the label inside the cabinet door or on the back of the drawer box. Pull one and read it before you call anyone. A finish name alone won’t get you there: KraftMaid runs multiple finish programs and a “wheat” from one program won’t match a “wheat” from another.
The OEM-versus-aftermarket decision is simpler than it looks for cabinets. On door fronts, drawer boxes, and finished end panels, we specify genuine KraftMaid so the finish and profile match. Aftermarket boxes and custom fronts can save money, but the color drift shows up under a Boulder City afternoon sun within about two years. On hardware, hinges, and interior fittings, quality aftermarket is fine. We source through documented KraftMaid channels, and we put the exact part number and finish code in the written scope so there’s nothing to argue about later. Because KraftMaid changes door profiles and finishes over time, we confirm current availability before the contract is signed, not after.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
Most of what we see in Boulder City isn’t a failed cabinet. It’s a failed assembly around a cabinet, or a cabinet fighting a house that wasn’t built for it. Here’s what to look at:
- Hinges squeaking or doors sagging within a year. Usually a hinge-plate screw pulling out of particle board, made worse by dry desert air shrinking the material. It’s a five-minute fix if caught early, and a door-front replacement if ignored.
- Swollen or delaminated cabinet boxes near a slab or exterior wall. Boulder City sits on caliche-heavy ground that moves with moisture, and plumbing or irrigation leaks wick up through cabinet bases before you see a puddle. If the box under your sink feels soft, there’s a leak to fix before the cabinet.
- Finish flaking or chalking on west-facing doors. UV exposure here is brutal. A finish that’s failing at year five is telling you the cabinet was installed in full sun with no shading, which is a design problem, not a KraftMaid problem.
- Doors that won’t sit flush after a remodel. Almost always a wall out of plumb, not a bad door. If your addition’s framing wasn’t checked for square before cabinets went in, the cabinets take the blame.
- Warped doors in a garage conversion or ADU. Unconditioned space swings 40 degrees between day and night. Cabinet-grade wood moves, and doors that fit tight in January won’t close in July. This is the single most common call we get on garage conversions in Boulder City.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what additions and ADUs actually cost in Boulder City, using the ranges we quote from. These are installed prices: design, permits, materials, labor, and finish. Not a “starting at” number.
| Project | Installed Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
| Kitchen Remodel (if the addition includes one) | $14,000 – $45,000 |
| Cabinet Installation | $4,000 – $13,000 |
What drives the range: square footage, foundation type (slab-on-grade is standard here, but caliche means excavation runs longer than you’d think), whether the addition shares a wall with conditioned space, and how much KraftMaid cabinetry the plan includes. A wet bar and a laundry wall add $4,000 – $13,000 in cabinet work alone. What’s included at every price point: a written line-item scope before any tool comes out, permits pulled and inspections passed, and the 365-Day Done Right Promise on the completed work. If something we installed fails within that year, we come back and correct it at no charge. That covers cabinet installation, finish, hardware, and everything else in the written scope.
DIY or Call Us?
You can safely check a few things before you call anyone. Read the label inside a cabinet door to identify your KraftMaid door style and finish code. Measure the width and depth of the cabinet run you want to match. Feel under the sink cabinet for softness or moisture. Look at the cabinet doors on the west side of the house for flaking finish. Write down what you find. All of that helps us quote accurately.
What you shouldn’t take on yourself: moving or removing load-bearing walls, cutting into a slab to rough in plumbing for an addition, running new electrical circuits for an ADU, or structural framing for a new roofline. Those are permit-and-inspection items in Boulder City, and getting them wrong means rework and a failed inspection that costs more than doing it right the first time. We’re licensed, insured, and we pull the permits. Our technicians have up to 22 years of experience. If you’re looking at a garage conversion that needs a full ADU-grade buildout, that’s not a weekend project.
Call (844) 797-9259 for a free estimate. A live person answers 24/7, and we’ll give you a written price before any work starts.
FAQs

A well-installed KraftMaid cabinet in a conditioned space will hold up 15 – 20 years or more, but that assumes two things: the cabinet was shaded from direct west sun, and the space stays conditioned year-round. In a garage conversion or unconditioned ADU, expect 8 – 12 years before hardware and finish start to show it. The difference is almost always heat cycling and UV, not the cabinet itself.
Often, yes. A sagging door is usually a hinge-plate screw pulling out, and that’s a repair. A swollen box near a leak is not repairable once the material has delaminated; it has to be replaced. Before you assume the worst, call us and describe what you’re seeing. We’ll tell you honestly whether it’s a repair or a replacement, and the estimate is free either way.
A home addition typically runs 3 – 5 months from permit to final inspection, and an ADU runs 5 – 8 months. Garage conversions usually land in the 6 – 10 week range. Permitting through Boulder City adds time that varies by project type, and we won’t promise a date we can’t hold. You’ll get the schedule in writing with the price.
We order genuine KraftMaid through documented channels and put the door style, finish code, and part number in the written scope. When a door profile or finish has been discontinued, we tell you before the contract is signed and give you the closest current match, plus options. We also work with Cambria, Silestone, and Kohler for surfaces and fixtures so the addition finishes as one cohesive space.
Ready to price your addition? Call (844) 797-9259 for a free estimate. We’ll talk through your KraftMaid match, your square footage, and what the Boulder City permit process looks like for your project. Written price before work begins. 365-Day Done Right Promise on the finished job.
Written by the team at Bradford Remodeling Boulder City, serving Boulder City and nearby areas.












